Drainage / PlattingDrainage topic → Official agency: Houston Permitting Center

Drainage Plans for Platting Review Checklist (OCE-1013)

What does Houston require for a drainage plan during platting review?

The official Drainage Plans for Platting Review Checklist (OCE-1013) is published by Houston Permitting Center and applies to projects in Houston, Texas. Use the official link below to access the current version directly — requirements and forms can change, so confirm the current version with Houston Permitting Center before any submittal.

Open Official Resource
Last verified 2026-09-04 · VERIFIED 2026-09-04

What is this resource?

Drainage Plans for Platting Review Checklist (OCE-1013) is a drainage / platting published by Houston Permitting Center for Harris County. It is identified as Form OCE-1013. The authoritative, current version is always the one published on the official page linked above.

When is this used?

This resource is used in Houston development, permitting and engineering review processes. Whether it applies to a specific project depends on the current requirements published by Houston Permitting Center — confirm the current requirements with the applicable jurisdiction before any submittal.

What may be required?

Requirements are defined solely by Houston Permitting Center and are published on the official resource page — ALFA Engineering is not the issuing government agency. Engineering documents commonly prepared by ALFA for projects that use this resource include:

Related verified resources

Design Manual / Standards
2026 Infrastructure Design Manual and Design & Construction Standards

Where can I find the current City of Houston Infrastructure Design Manual?

Houston · Houston Permitting Center
Grading / DrainageOCE-1008
Fill and Grade Requirements

What are the City of Houston fill and grade requirements?

Houston · Houston Permitting Center
Permit Portal
Houston Permitting Center

Where do I start a City of Houston permit or plan review?

Houston · Houston Permitting Center
Engineer CertificationOCE-1017
Storm Water Quality Engineer's Certification

Where can I find the Houston Storm Water Quality Engineer's Certification?

Houston · Houston Permitting Center

Related FAQs

Do I need a drainage study for my project?

Requirements depend on jurisdiction, acreage, impervious cover, outfall and floodplain conditions — always check the local criteria.

ALFA can determine the drainage-analysis scope and prepare calculations, exhibits and reports.

Do I need detention for my property?

There is no universal yes/no — local criteria explain the common triggers, and the answer depends on your specific project data.

ALFA can compare existing/proposed runoff and determine whether detention or another approved approach is needed.

Do I need a grading or land-disturbance permit?

Check the official permit criteria — only the published threshold determines whether a grading or land-disturbance permit applies.

ALFA can prepare grading, drainage and erosion-control documents for the applicable permit.

Submitting a plat? ALFA can prepare or review drainage calculations and exhibits before City review.

Request Project Review

ALFA Engineering, LLC — Houston Metro / Gulf Coast · Licensed Texas Professional Engineers

External government and agency resources are provided for convenience. Requirements, forms and URLs may change. Confirm current requirements with the applicable jurisdiction. ALFA Engineering is not the issuing government agency.